After the installation of the granite top, my Corian solid surface countertop was successfully installed, together with the Bareno sinks. Both sinks are undermounted.
I actually wanted the countertop edge to be bull-nosed but the installer did not do it as it was already 4pm and the management only allows drilling work up till 3pm. Since it looks nice anyway, I think I will stick to this.
Waiting for the final installment of the kitchen! Very happy with the kitchen outcome so far.
No comments:
Post a Comment
Thank you for your comment!